Rosehill Industrial Estate, Carlisle (Phase 1)

Design and construction of three new-build trade counter and light industrial units at Rosehill Industrial Estate, with reinforced foundations and high-spec finishes to suit future tenants.
Rosehill Industrial Estate, Carlisle (Phase 1)
Civil Engineering & Highways
Demolition and Site Remediation

What We Delivered at Rosehill Industrial Estate, Carlisle – Phase 1

Thomas Armstrong (Construction) Ltd was appointed to carry out the design and construction of three new industrial/trade counter units as part of a phased development at Rosehill Industrial Estate in Carlisle.

This project included the construction of steel portal frame buildings with traditional facing brickwork and profiled cladding above. Each unit was completed to shell standard with service connections, ready for tenant fit-out. The units were constructed with flexibility in mind to support future tenant needs and uses.

External works included large concrete service yards, permeable block paving to car parks, road surfacing and new boundary treatments. All works were delivered in accordance with the latest planning and building regulation requirements, with strong coordination between the design team, structural engineers and subcontractors.

Client

H & H Group Plc

Project Completed

May 2018

Duration

91 Weeks

Value

£2.4m

Contract

NEC3 Option A Design and Build with early contractor involvement
No items found.
No items found.

Civil Engineering & Highways services delivered at Rosehill Industrial Estate, Carlisle (Phase 1)

Works Included:

  • Design and construction of 3 light industrial units
  • Steel portal frame structure with facing brick and profiled cladding
  • Precast concrete floors and insulated composite roof panels
  • Installation of service ducts and capped utilities to each unit
  • Formation of reinforced concrete service yard
  • Permeable block paving to car park areas
  • Tarmac surfacing, fencing and boundary works
  • Landscaping and lighting installations
  • Coordination with consultants and structural engineer throughout

Project Achievements:

  • Delivered on time and within programme
  • Flexible, high-quality space provided for multiple tenant types
  • Compliant with all relevant planning, building and fire safety regulations
  • Strong collaboration with client and design team
  • Set the foundation for future phases of industrial estate development